VRP Drift / BB Status
MIUSA, Verity, and BB Base VRP Update
Published 2026-05-29 ยท VRP is the Adam-facing review surface
Current Sync Fix
Active Project and WO surfaces are now synced across both VRPs.
- Projects PROJ-0011 through PROJ-0017 exist on both sites.
- WOs WO-2026-00001 through WO-2026-00003 exist on both sites.
- WO-2026-00003 records the VGATE dual-site sync rule.
Drift Status
Installed-app parity is confirmed. Full DB-level parity is not fully certified yet.
- Same installed apps: Frappe, ERPNext, payments, webshop, verity_wk_relay, vrp.
- Same active work Project and WO records now verified.
- Remaining proof needed: DocTypes, custom fields, roles, permissions, routes, hooks, scheduler, and source hashes.
BB Server
BB remains a gated base-VRP build target, not an active build.
- Target from AI plan: NYC-SSD-01 / BB server, high-capacity node.
- Plan exists for base Frappe/ERPNext + VRP sandbox.
- No BB build execution is authorized until VGATE approval and drift proof are accepted.
Hot Links
Standing rule: Adam-facing work follows VGATE, attaches to an exposed WO, appears in the WO/Projects area, and syncs both VRPs unless Adam explicitly approves a one-site exception.